Roller suspension Precast Reinforced Concrete Pipe Machine

FRT 800-1200*3000 roller suspension reinforced concrete pipe machine making concrete drain pipes is a new concrete pipe production process. Hard drying concrete should be used in precast concrete pipe production as this kind concrete is featured with high denseness, and less unit water consumption volume and water-cement ratio, saving cement. Earlier strength increases fast and high quality of concrete pipe. Meanwhile, fast forming speed and short time of curing speed up project construction process.

Roller suspension Precast Reinforced Concrete Pipe Machine


 Precast Reinforced Concrete Pipe Machine.jpg

FRT 800-1200*3000  roller suspension reinforced concrete pipe machine making concrete drain pipes  is a new concrete pipe production process. Hard drying concrete should be used in precast concrete pipe production as this kind concrete is featured with high denseness, and less unit water consumption volume and water-cement ratio, saving cement. Earlier strength increases fast and high quality of concrete pipe. Meanwhile, fast forming speed and short time of curing speed up project construction process.

Whole Reinforced Concrete pipe machine is assembled after all components(include part components) are checked qualified. It can be assembled after platform level is well adjusted which platform can be composed with two parts.


Reinforced Concrete pipe machine.jpg


Front and back portal is located and fixed on platform according to layout requirement on platform level( side door can be connected with front and back portal if you want to use side door). level catercorner of machine shelf and verticality of front and back portal frame column can be adjusted.  Vertical shaft supporting base and flexible portal seat interarea which max error is 0.1mm/m are assembled the front vertical side before front portal frame column. Fixed the connect point of roller suspension concrete pipe machine after other components assembled on concrete culvert pipe machine frame are checked qualified. Vertical shaft, flexible portal, flexible portal base and flexible portal lifting part assembled on Overhang concrete pipe machine should reach the requirements of flexible opening of flexible portal, flexible switch, without open and close itself and good connection of flexible portal base and flexible portal.


Basic axis is parallel with level(regularly smaller than 0.02mm/m), the deviation between supporting hole and suspense roller axis is regularly smaller than 2mm when assembling overhang shaft.

Power plant and intermediate transmission plant assembled. Pay attention to parallel of related shafts when assembling. Flatness and Triangle tape of Triangle tape wheel set, sprocket group( some unit don’t use it), and tension degree of sprocket should be designed and adjusted as per related design requirements.



Assembled reinforced precast concrete pipe machine should be checked thoroughly if there are wrong assembled or short assembled according to the requirements of layout after all components are assembled. Correct it if wrong assembled or short assembled. Main size of whole reinforced concrete pipe mould machine is checked and adjusted in time if there is error. And then inspect rotary parts with hand.  Overhang shaft is checked first if it rotates flexible and adjusted in time if jammed. Main shaft jumping is checked extensively with max error 1.5mm, find the reason and repairing and adjusting until reach standard if error is higher than 1.5mm. Other rotary parts is checked and adjusted in time if there is abnormal reason. Main roller suspension reinforced precast concrete pipe machine is almost finished after above assembling are checked without problems.



TAG:   Reinforced Concrete Pipe Machine Precast Concrete Pipe Machine